Published pricing · Sacramento
What floors actually cost in Sacramento.
Published prices. Itemized quotes. No games.
Every number on this page is on the record. If a bid you got elsewhere refuses to itemize like ours does, that is your answer to “why is it cheaper.”
Installed pricing, on the record.
Installed means installed: KONO materials, acoustic underlayment, labor by our own crews, and standard trim — under one lifetime warranty. Materials-only rows are the same shelf DIYers and pros buy from, same lot discipline.
| Collection | Materials only | Installed by KONOrange, materials + labor | Typical installedwhere most homes land |
|---|---|---|---|
| KONO Laminate12 mm · AC5 · Uniclic® · KO-1xx colors | $3.29/sqft · $78.66 per box | $5.99 – $8.49/sqft | $6.79/sqft |
| KONO LVPFully waterproof · kitchen to bath · KV-3xx colors | $2.79/sqft, from | $5.49 – $7.49/sqft | $6.29/sqft |
| Parquet CollectionEuropean oak · herringbone & plank — coming soon | Coming soonno published numbers yet — join the list | ||
Sample template pricing while our first factory lots are labeled; every quote is finalized against your specific production lot. Demolition, subfloor prep, and transitions are always their own lines — see the sample quote below.
Anatomy of a KONO quote.
A real quote is a document you can argue with. Here is a sample, line by line, with the reason each line exists in the margin.
Your floor, installed
Your house, specifically
Deposit $562 — California caps it at $1,000 or 10%, whichever is less. Balance due only after your walkthrough. Sample document with template pricing, finalized per production lot.
Why three quotes can differ by $10,000.
Same room, same laminate, wildly different totals. It is almost never the flooring — it is one of these four.
One bid includes demolition, haul-away, and trim; another leaves them “TBD.” Same floor, thousands apart before a single plank clicks.
Flattening a 1948 subfloor can cost $300 or $3,000. A quote that skips the laser check is a guess — and the guess becomes your change order.
W-2 crews, insurance, a showroom, and a warranty reserve cost real money. A bid without them is cheaper — until year three, when you need someone to answer.
Small jobs carry trip minimums; big jobs earn volume breaks. Two honest bids can sit dollars-per-sqft apart on project size alone.
The number on your quote holds for 90 days, even if our container costs move.
No extra work and no extra dollar without a written change order you sign first.
Deposits capped at $1,000 or 10%, whichever is less — per CSLB rules. Anyone asking for half up front is telling you something.
Final payment only after your walkthrough, with product and labor under one warranty.
Your number, in 10 seconds.
The instant estimator runs on these exact published rates. Or take our worksheet to your other bids and compare line by line.